Boats

Sign in
Milk Run

2003 Beneteau Oceanis 42CC "AFFINITY", Alameda, CA (Richard Boland Yachts)

11/20
2003 Beneteau Oceanis 42CC "AFFINITY"View listing

Ability analysis

Everything below is costed to cross the Pacific.

Specifications

Asking price

$130,000

Length

43.5 ft

Draft

5.92 ft

Capability

5.5

Offshore, of 10

Two lines here look like the same work

  • · 300ft of 5/16in G4 chain, snubber and swivel — 150ft aboard· 300ft of 5/16in G4 chain, snubber and swivel — 150ft still needed

Nothing has been merged. If one is redundant, remove it below — a removed line keeps its history and can be brought back.

The facts have moved since these costs were worked out

How well it is known changed The figures below still reflect what was known before.

Rebuilt from 57 recorded facts, not from the documents again.
ItemCost estimateProbabilityPriorityProductWhat and whyRangeNotes
$10,800

Replace all standing rigging, wire and terminals, including unstep and re-step

$13,500

$0$38k
80%$10,800
weighted into totals
blocks—

—

$9k–$21k

—

$1,430

Fit a dedicated trysail track to the mast and fully service the in-mast furler

$2,600

$0$9k
55%$1,430
weighted into totals
——

—

$1k–$5k

—

$1,760

Renew halyards and primary sheets

$2,200

$0$7k
80%$1,760
weighted into totals
blocks—

—

$1k–$4k

—

$3,420

Pre-passage engine service on the Yanmar 4JH3E: impeller, belts, all coolant and fuel hose, filters, valve clearances, exhaust elbow inspection and mount inspection

$3,800

$0$13k
90%$3,420
weighted into totals
blocks—

—

$2k–$7k

—

$1,500

Cutless bearing, shaft seal service and shaft alignment at the survey haulout

$2,000

$0$8k
75%$1,500
weighted into totals
blocks—

—

$1k–$4k

—

$1,050

Renew fuel hose, fittings and primary filtration; draw a tank sample and polish the fuel

$1,400

$0$6k
75%$1,050
weighted into totals
blocks—

—

$600–$3k

—

$1,200

Hydraulic steering fluid change, bleed and pressure test, and fit a bypass valve to the cylinder so the emergency tiller is usable

$1,500

$0$6k
80%$1,200
weighted into totals
blocks—

—

$700–$3k

—

$2,240

Bottom paint: prep and two coats of antifouling at the survey haulout

$3,200

$0$11k
70%$2,240
weighted into totals
——

—

$2k–$6k

—

$960

Service and rebuild all winches, replace worn pawls and springs

$1,200

$0$5k
80%$960
weighted into totals
——

—

$600–$3k

—

$2,040

Exercise, service and re-grease all seacocks at the survey haulout; replace individual valves found seized

$2,400

$0$9k
85%$2,040
weighted into totals
blocks—

—

$1k–$5k

—

$425

LPG system inspection, pressure and leak test of the propane installation

$500

$0$2k
85%$425
weighted into totals
blocks—

—

$250–$900

—

$2,625

Bimini over the centre cockpit with a connector to the existing hard dodger

$3,500

$0$12k
75%$2,625
weighted into totals
——

—

$2k–$7k

—