2003 Beneteau Oceanis 42CC "AFFINITY", Alameda, CA (Richard Boland Yachts)
View listingAbility analysis
Everything below is costed to cross the Pacific.
Specifications
$130,000
43.5 ft
5.92 ft
5.5
Offshore, of 10
Two lines here look like the same work
- · 300ft of 5/16in G4 chain, snubber and swivel — 150ft aboard· 300ft of 5/16in G4 chain, snubber and swivel — 150ft still needed
Nothing has been merged. If one is redundant, remove it below — a removed line keeps its history and can be brought back.
The facts have moved since these costs were worked out
How well it is known changed The figures below still reflect what was known before.
| Item | Cost estimate | Probability | Priority | Product | What and why | Range | Notes |
|---|---|---|---|---|---|---|---|
| $10,800 | |||||||
Replace all standing rigging, wire and terminals, including unstep and re-step | $13,500 $0$38k | 80%$10,800 weighted into totals | blocks | — | — | $9k–$21k | — |
| $1,430 | |||||||
Fit a dedicated trysail track to the mast and fully service the in-mast furler | $2,600 $0$9k | 55%$1,430 weighted into totals | — | — | — | $1k–$5k | — |
| $1,760 | |||||||
Renew halyards and primary sheets | $2,200 $0$7k | 80%$1,760 weighted into totals | blocks | — | — | $1k–$4k | — |
| $3,420 | |||||||
Pre-passage engine service on the Yanmar 4JH3E: impeller, belts, all coolant and fuel hose, filters, valve clearances, exhaust elbow inspection and mount inspection | $3,800 $0$13k | 90%$3,420 weighted into totals | blocks | — | — | $2k–$7k | — |
| $1,500 | |||||||
Cutless bearing, shaft seal service and shaft alignment at the survey haulout | $2,000 $0$8k | 75%$1,500 weighted into totals | blocks | — | — | $1k–$4k | — |
| $1,050 | |||||||
Renew fuel hose, fittings and primary filtration; draw a tank sample and polish the fuel | $1,400 $0$6k | 75%$1,050 weighted into totals | blocks | — | — | $600–$3k | — |
| $1,200 | |||||||
Hydraulic steering fluid change, bleed and pressure test, and fit a bypass valve to the cylinder so the emergency tiller is usable | $1,500 $0$6k | 80%$1,200 weighted into totals | blocks | — | — | $700–$3k | — |
| $2,240 | |||||||
Bottom paint: prep and two coats of antifouling at the survey haulout | $3,200 $0$11k | 70%$2,240 weighted into totals | — | — | — | $2k–$6k | — |
| $960 | |||||||
Service and rebuild all winches, replace worn pawls and springs | $1,200 $0$5k | 80%$960 weighted into totals | — | — | — | $600–$3k | — |
| $2,040 | |||||||
Exercise, service and re-grease all seacocks at the survey haulout; replace individual valves found seized | $2,400 $0$9k | 85%$2,040 weighted into totals | blocks | — | — | $1k–$5k | — |
| $425 | |||||||
LPG system inspection, pressure and leak test of the propane installation | $500 $0$2k | 85%$425 weighted into totals | blocks | — | — | $250–$900 | — |
| $2,625 | |||||||
Bimini over the centre cockpit with a connector to the existing hard dodger | $3,500 $0$12k | 75%$2,625 weighted into totals | — | — | — | $2k–$7k | — |