Boats

Sign in
Jenny Replacement

2000 Catalina 36 MkII "EMESE", Emeryville, California

6/16
2000 Catalina 36 MkII "EMESE"View listing

Ability analysis

Everything below is costed to cross the Pacific.

This boat has not been researched for Offshore, so the money below is withheld rather than estimated. Use Re-analyse and tick Offshore.

Specifications

Asking price

$69,000

Length

36.33 ft

Draft

5.83 ft

Capability

5.8

Offshore, of 10

The score is real: capability is a re-weighting of design research that has already been paid for. The costing is not — this boat has no Offshore analysis, so there are no refit figures below.

What is known

Every claim anyone has made about this boat, with the sentence its source actually said. Where two sources disagree, both are kept and one is chosen — and you can change which. This is the log the cost model reads from, so a value corrected here is a value corrected everywhere.

7 facts from 7 claims

The boat

  • Length overall36.33

    the listing · Sept 2026 · affects the money

    Drives slip class, haul-out rates and per-foot yard charges.
    —
  • Beam11.92

    the listing · Sept 2026 · affects the money

    A 21ft-beam catamaran costs far more to berth than its length suggests.
    —
  • Draft5.83

    the listing · Sept 2026 · affects the money

    A specification, not a gate — there is no draft criterion in this app.
    —
  • Displacement13500

    the listing · Sept 2026 · affects the money

    Feeds the capability scores and the ground-tackle sizing.
    —
  • Year built2000

    the listing · Sept 2026 · affects the money

    Age drives the rigging, sail and engine assumptions.
    —
  • Asking price69000

    the listing · Sept 2026 · affects the money

    The base of every derived figure. Newest wins; it is not a conflict.
    —
  • Where she liesEmeryville, California

    the listing · Sept 2026 · affects the money

    Decides the delivery leg and which yard rates apply.
    —

Facts are extracted from uploaded evidence on the Documents tab, and the costs that rest on them are rebuilt from the Costs tab.