Milk Run
2001 Tayana Vancouver 42 "KI", Long Beach, California
13/20
View listingAbility analysis
Everything below is costed to cross the Pacific.
Specifications
Asking price
$139,000
Length
41.75 ft
Draft
5.83 ft
Capability
7.0
Offshore, of 10
Assistant's read — an opinion, not a source
- KI remains the strongest monohull candidate in the fleet for the actual Pacific crossing: conservative ratios, encapsulated ballast, skeg-hung rudder, cutter rig, post-1992 vinylester hull, molded non-skid instead of the model's usual teak deck, and a unusually complete 2021-22 cruising refit.
- The main revisions from the prior payload are: the draft gate is re-confirmed at 5ft 10in; the listing now directly supports a high-capacity belt on the 160A alternator, a vented propane locker and remote stove shutoff, and fuel tanks having been polished/cleaned; the current tank itemisation is 94gal fuel and 120gal water despite model/spec fields of 120gal and 150gal; conditional generic-gear zeroes for the autopilot, AIS, VHF handheld, NMEA backbone, Starlink Mini, solar controllers and emergency-steering package have been removed where the listing does not prove a serviceable catalogue-equivalent item.
- The previous cost line for delivery from Long Beach has been moved out of costItems into seakeeping.delivery to avoid double-counting, but it is still costed.
Costed to cross the Pacific.
Where the money goes
- Purchase $139k
- Use tax $15k
- Refit $82k
- Risk $27k
- Unknowns $23k
- Holding $22k
- Purchase
- $139,000
- CA use tax
- $14,595
- Required refit
- $61k–$122k
- Risk, expected
- $27,025
- Unknown reserve
- $22,620
- Holding
- $21,522
contemplated offer
20 items still unpriced
15 open · $254k if all hit
systems not yet looked at
slip $10k · insurance $3k · tax $2k
- Cash to ready
- $258k–$369k
- All-in, ready to depart
- $269k–$380k
- Taxes
- $16,124
CA use $15k · property $2k/yr
Schedule
A boat that cannot be ready is not cheaper, it is a year late.
ready in 33 weeks38 weeks spare
How much of this is actually known
A boat priced from guesses is a different risk from one priced from quotes, at the same total.
Costs actually quoted0%
Systems assessed0%
Much of the list above is only answerable by whoever owns her now.